Spraying workshop
The partition workshop covers a total area of 5,000㎡, with 55 technicians and 20 pieces of professional equipment, adopting the 6S workshop management mode. It takes 4 days from the board cutting, board connecting, plate drilling, fabric covering, and assembly to the final packaging. The one-time pass rate of products reaches 99%. The monthly production capacity reaches 25000㎡.